CPM 3-V

Price: $141.5563854

Variant Information

  • Steel Name:

    cpm 3-v

  • Thickness:

    .188"

  • Finishing Thickness:

    .156"

  • Thickness Range:

    .172"/.188"

  • Width:

    3"

  • Length:

    24"

  • Finish:

    wide belt ground

  • Steel Type:

    Oversized

SKU: N/A Categories: ,
Steel Tolerance Chart
FractionDomestic RangeFinished
1/16".065/.0720.0625
3/32".103/.1130.094
1/8".140/.1560.125
5/32".172/.1880.156
3/16".207/.2270.187
1/4".270/.3050.250
3/8".390/.4000.375

Description

CPM 3-V is a tough and well known Crucible steel with a fair amount of chromium and the ability to hold a very fine edge, but slightly simpler in composition than S30 or S35-VN.

Between the corrosion resistance and toughness, CPM 3-V rarely disappoints and fits a wide range of categories for blades where a more expensive CPM may not be necessary.

Like all Crucible CPMs, the combination of powdered metallurgy and Crucible quality stand out in a performance steel that readily adapts to almost any situation.

NJSB also offers decarb free grinding for an additional fee if you do not, or cannot, surface grind at your shop.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Heat Lot Certifications

Listed below are our current LIVE and the most recently CLOSED material lot certifications per thickness:

PreviousCurrent
CPM 3V .070 (1/16”)N/ANP67996
CPM 3V .094 (3/32”)N/ANP68215
CPM 3V .125 (1/8”)NP69721NP67594
CPM 3V .156 (5/32”)NP69010NP70189
CPM 3V .187 (3/16”)NP69719 NP69719
CPM 3V .250 (1/4”)NP69719 NP69981

CPM 3-V Heat Treat

You can download our CPM 3-V Heat Treat PDF. It contains all of the information mentioned below.

Important – Before Treating

  • Knives should be cleaned by washing with soapy water and then either placed into foil pouch or coated with high temperature anti-scale/decarburization compound prior to heat treat if not using Oxygen free heat treat equipment.
  • Skipping stages such as pre-heating and equalizing or cryo will result in lower hardness, higher amounts of Retained Austenite (RA), impaired stain resistance or other issues. Ramp AFAP (as fast as possible) between preheating and austenizing temps.
  • Clamping flat after quench during cryo or tempering recommended to avoid thermal shock induced warp.
  • Figures represent quenching under positive pressure with aluminum plates and compressed air to at or below 125°F / 50°C–alternative quenching methods may present lower hardness, high RA, or other issues.
Pre-Heat/Equalizing Austenizing Temperature Expected RC
(as quenched prior to cryo)
1,550°F / 845°C
Hold 10-15 Minutes
1,950°F / 1065°C
Soak 30 Minutes
60RC (62 after Cryo)

Cyrogenic Treatment

  • A cryogenic treatment is recommended to convert retained austenite, and can either be done before or after the first temper cycle.
  • Liquid Nitrogen is recommended for the needed -280°F / -137°C
  • Submerge in sub-zero treatment 10 hours depending on thickness and number of blades.
  • A cryogenic treatment can be done immediately done after quench, but it is recommended blades be clamped flat to avoid thermal shock induced warp–cryo treatment should always be followed by a tempering cycle.

Tempering

  • Once blade is quenched and near ambient temperature, blades should be tempered accordingly, the times suggested are to ensure even, consistent temperature.
  • Figures supplied are as representative of industrial standards.
  • If using a small toaster oven or household kitchen oven for tempering, using a blade holding rack made from kiln furniture, a roasting tray lined with fine sand, or similar large object will help retain thermal mass to reduce wide swinging temperatures as the device fluctuates trying to maintain temperature.
  • Note: Final hardness values vary based on initial as-quenched hardness and percentage of conversion to Martensite. Only reliable testing methods, e.g. calibrated Rockwell hardness tester, can provide actual hardness values–hardness calibrated files and chisels are relative testing methods and inaccurate for true hardness value reading.
  • Temper twice for 2hrs.
  • Manufacturers warn against tempering at 800°F / 425°C and above as sensitization will result in reduction of toughness and corrosion resistance.
  • The included Heat Treat Schedule on this page is formulated based upon Industry standards and data from ASM International, Crucible and other foundry spec sheets, and Kevin Cashen (independent researcher, ferroalloy metallurgist, and bladesmith of Matherton Forge).
Temperature Hardness (2 hour x2 guideline)
975°F / 523°C 61RC
1000°F / 537°C 60-59

Heat Treating Disclaimer

  • Suggested heat treatment are based on the recommended specifications for use in ovens, high temp salts, and similarly, properly calibrated equipment; and in line with proper industrial standards for quenching. Deviation from industry standards for schedules, equipment, quenching mediums; and hardness testing equipment may result in varied results. The supplied information on this page is on a generalized scale with the above mentioned standards and methods, which is why soak times and similar aspects may vary in time length to include a margin for the available heat treating equipment and steel cross section.
  • If you are unsure if you have the necessary means to heat treat on-site, we recommend professional heat treating services provided by Peters Heat Treat or Bos Heat treating; or industry specific services by knife material dealers such as TruGrit or Texas Knifemaker’s Supply–check with suppliers to see if they offer HT services and ensure they follow industry standards.
  • NJSB LLC is not liable or responsible if proper industry heat treating protocols are not applied; particularly and especially if sending to an independent heat treat provider if they do not follow the intended heat treat schedule or standards for that particular steel; or damage they cause while in their possession.

Other Resources

You may also like…